The second set of presentations began this week, with the 1/12 scale teams presenting their new information from the past two weeks that was not already presented in the first round of presentations.
The work on our bender is going well, matching with the Gantt chart schedule as expected. Testing of actual bending of material is expected to take time, in conjunction with trial-and-error shaping of dies to achieve the bends required by the track improvement team.
Wednesday, October 26, 2016
Wednesday, October 19, 2016
Week 7: Gathering numbers
This week we focused on gathering information and numbers from previous year's design and compared with the actual product they produced. The main point of doing this was to see what challenges they met and why the track did not work properly.
Measurements:
Materials:
The design for the rapid prototype has been reverted to the
original design shown in the first presentation, contrary to what was verbally stated
during the presentation. This choice was made due to material availability as
well as available support options.
Measurements:
Materials:
Wednesday, October 12, 2016
Week 6 - Finalize Initial Design & Models
Initial design nears completion. The idea for the original
bender appeared to be more work than creating a copy of a Hossfeld, so a change
in direction was made. Additional time required to accommodate the design is
acceptable, as the plan between this week and the next is to finalize a design
to begin construction of.
Access to the on-campus machine shop is yet forthcoming.
Investigation into why the process is taking as long as it is will be made this
week, as fabrication is to start soon.
Die sizing will be determined by the final numbers from the
track team. A 1:1 die will not be used, due to the curvature required being
fairly large. Odds are that revisions to die size will be the most time-consuming
portion of the project, if bender arms can be fabricated without much
difficulty.
See individual blogs' weekly post for more information.
Presentation 1:
See individual blogs' weekly post for more information.
Presentation 1:
Wednesday, October 5, 2016
Week 5 - Presentation 1, Impacts On Prototyping
The first round of presentations continues this week. Plans for
our bender are currently in flux, with requirements necessitated by other teams
not yet fully defined. The most significant dimensional requirements stem from
the track improvement team, which detail the requirements of the new track.
Intercommunication
continues with all other small-scale teams, as weekly meetings and the Slack
group aid in information sharing.
An updated Gantt chart outlines the goals we
aim to achieve and the timeline in which we plan to do so, but the impact of delayed
access to the on-campus fabrication shop and special requirements by other
teams have yet to be accounted for. However, we believe that there is still
ample time to complete a prototype on time, and that we are still on track even
with a slightly compressed schedule.